This sequence specifies the operation mode of a AHU system, which may serve multiple zone group. It is implemented according to Section 5.15.1 of ASHRAE Guideline G36, May 2020.
When zone group served by an air-handling system are in different modes, the following hierarchy applies (highest one sets AHU mode):
See the operation mode enumeration in Buildings.Controls.OBC.ASHRAE.G36.Types.OperationModes for the detailed description.