.Buildings.Controls.Sources.Examples.DayType

Information

This example generates signals for three different work weeks. The instance dayTypMon outputs a signal with five working days, followed by two non-working days. The instance dayTypSat does the same, except that the first days is a non-working day. The instance dayTypTwoWeeks outputs six working days, followed by 8 non-working days. The instance dayTypMonThr is configured the same as dayTypMon, except that it outputs the type of the day for three days, starting with the current day, then the next day and the day after.

Revisions


Generated at 2024-11-22T19:25:38Z by OpenModelicaOpenModelica 1.24.2 using GenerateDoc.mos