.Buildings.DHC.ETS.Combined.Subsystems.Validation.SwitchBox

Validation of flow switch box

Information

This model validates that Buildings.DHC.ETS.Combined.Subsystems.SwitchBox maintains a positive flow rate in the district line outside of the temporization period set by the controller.

Contents

NameDescription
MediumMedium model

Generated at 2026-01-10T19:14:01Z by OpenModelicaOpenModelica 1.26.0 using GenerateDoc.mos