modelEventSequencingMultiple

Validation model for staging event sequencing of a group of heat pumps

Information

This model validates Buildings.Templates.Plants.Controls.HeatPumps.Subsequences.EventSequencingMultiple in a configuration with one reversible heat pump and one polyvalent heat pump, with dedicated primary pumps and isolation valves at the HP inlet and at the polyvalent HP outlet.

Parameters

TypeNameDefaultDescription
IntegernHp1Number of reversible heat pumps
IntegernPhp1Number of polyvalent units

Components

TypeNameDefaultDescription
Buildings.Templates.Plants.Controls.HeatPumps.Subsequences.EventSequencingMultipleseqEveStaging event sequencing
Buildings.Controls.OBC.CDL.Logical.Sources.TimeTableu1HeaHpPhpHeating enable command – HP (index 1) and polyvalent HP (index 2)
Buildings.Controls.OBC.CDL.Logical.Sources.TimeTableu1CooHpPhpCooling enable command – HP (index 1) and polyvalent HP (index 2)
Buildings.Controls.OBC.CDL.Logical.Sources.TimeTableu1ShcPhpSHC enable command – Polyvalent HP
Buildings.Controls.OBC.CDL.Logical.Sources.TimeTableu1PumHeaWatPriDedDedicated primary HW pump status – HP (index 1) and polyvalent HP (index 2)
Buildings.Controls.OBC.CDL.Logical.Sources.TimeTableu1PumChiWatPriDedDedicated primary CHW pump status – Polyvalent HP

Revisions

  • July 3, 2026, by Antoine Gautier:
    First implementation.