.Buildings.Templates.Plants.Controls.Pumps.Primary.Validation.EnableLeadHeadered

Information

This model validates Buildings.Templates.Plants.Controls.Pumps.Primary.EnableLeadHeadered in a configuration with two production units, either parallel piped or series piped, with either two-position or modulating isolation valves.

Revisions


Generated at 2025-01-06T19:25:54Z by OpenModelicaOpenModelica 1.24.3 using GenerateDoc.mos