A stage is deemed available if both the following are true:
-
Each equipment required to run at that stage without
lead/lag alternate is available.
-
The number of equipment required to run at that stage –
with or without lead/lag alternate – and available
is greater or equal to the number of equipment required to run
at that stage.
Otherwise, the stage is deemed unavailable.
Generated at 2024-12-11T19:25:49Z
by OpenModelicaOpenModelica 1.24.2 using GenerateDoc.mos