Compute stage availability
A stage is deemed available if both the following are true:
-
Each equipment required to run at that stage without
lead/lag alternate is available.
-
The number of equipment required to run at that stage –
with or without lead/lag alternate – and available
is greater or equal to the number of equipment required to run
at that stage.
Otherwise, the stage is deemed unavailable.
Generated at 2025-03-14T19:24:29Z
by OpenModelicaOpenModelica 1.24.5 using GenerateDoc.mos