modelEquipmentAvailability
Validation model for the evaluation of equipment availability
Information
This model validates
Buildings.Templates.Plants.Controls.StagingRotation.EquipmentAvailability
for heating-only applications (component avaHeaCoo) and heating and cooling
applications (component avaHea).
Components
| Type | Name | Default | Description |
|---|---|---|---|
| Buildings.Templates.Plants.Controls.StagingRotation.EquipmentAvailability | avaHeaCoo | Evaluate equipment availability – Heating and cooling | |
| Buildings.Controls.OBC.CDL.Logical.Sources.TimeTable | u1Ava | Equipment available signal | |
| Buildings.Controls.OBC.CDL.Logical.Sources.TimeTable | u1Coo | Equipment enabled in cooling mode | |
| Buildings.Controls.OBC.CDL.Logical.Sources.TimeTable | u1Hea | Equipment enabled in heating mode | |
| Buildings.Templates.Plants.Controls.StagingRotation.EquipmentAvailability | avaHea | Evaluate equipment availability – Heating only | |
| Buildings.Templates.Plants.Controls.StagingRotation.EquipmentAvailability | avaCoo | Evaluate equipment availability – Cooling only |
Revisions
-
March 29, 2024, by Antoine Gautier:
First implementation.