modelEquipmentAvailability

Validation model for the evaluation of equipment availability

Information

This model validates Buildings.Templates.Plants.Controls.StagingRotation.EquipmentAvailability for heating-only applications (component avaHeaCoo) and heating and cooling applications (component avaHea).

Components

TypeNameDefaultDescription
Buildings.Templates.Plants.Controls.StagingRotation.EquipmentAvailabilityavaHeaCooEvaluate equipment availability – Heating and cooling
Buildings.Controls.OBC.CDL.Logical.Sources.TimeTableu1AvaEquipment available signal
Buildings.Controls.OBC.CDL.Logical.Sources.TimeTableu1CooEquipment enabled in cooling mode
Buildings.Controls.OBC.CDL.Logical.Sources.TimeTableu1HeaEquipment enabled in heating mode
Buildings.Templates.Plants.Controls.StagingRotation.EquipmentAvailabilityavaHeaEvaluate equipment availability – Heating only
Buildings.Templates.Plants.Controls.StagingRotation.EquipmentAvailabilityavaCooEvaluate equipment availability – Cooling only

Revisions

  • March 29, 2024, by Antoine Gautier:
    First implementation.