modelStageAvailability

Validation model for the evaluation of stage availability

Information

This model validates Buildings.Templates.Plants.Controls.StagingRotation.StageAvailability in a configuration with three equally sized units (component avaStaEqu) and in a configuration with one small unit and two large equally sized units (component avaStaOneTwo). Only the units of the same size are lead/lag alternated.

Components

TypeNameDefaultDescription
Buildings.Controls.OBC.CDL.Logical.Sources.TimeTableu1AvaEquEquipment available signal
Buildings.Templates.Plants.Controls.StagingRotation.StageAvailabilityavaStaEquCompute stage availability – Equally sized units
Buildings.Templates.Plants.Controls.StagingRotation.StageAvailabilityavaStaOneTwoCompute stage availability – One small equipment, two large equally sized equipment

Revisions

  • March 29, 2024, by Antoine Gautier:
    First implementation.