.
Dynawo
.
Examples
.
HVDC
.
HVDC
Information
This test case works with Modelica Standard Library 3.2.3.
This test case consists in one HVDC link connected to two infinite buses. A short-circuit at the HVDC link terminal 2 is simulated at t = 8 s and cleared at t = 9 s.
Generated at 2024-12-04T19:25:49Z by
OpenModelica
OpenModelica 1.24.2 using
GenerateDoc.mos