.Dynawo.Examples.HVDC.HVDC

HVDC link connected to two infinite buses

Information

This test case works with Modelica Standard Library 3.2.3.

This test case consists in one HVDC link connected to two infinite buses. A short-circuit at the HVDC link terminal 2 is simulated at t = 8 s and cleared at t = 9 s.