.Dynawo.Examples.HVDC.HVDC

Information

This test case works with Modelica Standard Library 3.2.3.

This test case consists in one HVDC link connected to two infinite buses. A short-circuit at the HVDC link terminal 2 is simulated at t = 8 s and cleared at t = 9 s.








Generated at 2024-12-04T19:25:49Z by OpenModelicaOpenModelica 1.24.2 using GenerateDoc.mos