.Dynawo.Examples.IEEE57.TestCases

Contents

Name Description
 IEEE57NoEvent IEEE 57-bus system benchmark formed with 57 buses, 7 generators, 3 shunts, 16 transformers, 63 lines and 42 loads, with no event
 IEEE57DisconnectLine IEEE 57-bus system benchmark formed with 57 buses, 7 generators, 3 shunts, 16 transformers, 63 lines and 42 loads, with a line disconnection
 IEEE57HvdcPsDisconnectLine IEEE 57-bus system benchmark formed with 57 buses, 7 generators, 3 shunts, 16 transformers, 1 phase shifter, 63 lines, 1 HVDC line and 42 loads, with a line disconnection

Generated at 2026-04-07T18:18:28Z by OpenModelicaOpenModelica 1.26.3 using GenerateDoc.mos