model_3_maschine_scheme_IB_new

Information

This scheme is widely used in Peter the Great St. Petersburg Polytechnic university as a part for bachelor's degree thesis last chapter, which is dedicated to dynamic stability investigarion.

Each node of this scheme has a short circuit shunt, which allows to simulate different types of short circuit.

The main purpose of this scheme is to show and teach the students the main ways to increase the degree of dynamic stability, which can be expressed in limit short circuit time.

Specifically in this scheme the scenario is as follows:

0 s: start;

50 s: three-phase short-circuit in node_7;

50.2 s: end of short-circuit, disconnection of L1;

50.4 s: reduction of the G1 power plant active power generation;

50.5 s: automatic reclosing of L1;

65 s: three-phase short-circuit in node_2;

65.1 s: start of fast G2 turbine valving control;

65.15 s: end of short circuit;

65.3 s: end of G2 fast turbine valving control

80 s: end.

Connectors

TypeNameDefaultDescription
Interfaces.Nodenode_14
Interfaces.Nodenode_13
Interfaces.Nodenode_15
Interfaces.Nodenode_12
Interfaces.Nodenode_10
Interfaces.Nodenode_11
Interfaces.Nodenode_7
Interfaces.Nodenode_16
Interfaces.Nodenode_8
Interfaces.Nodenode_21
Interfaces.Nodenode_9
Interfaces.Nodenode_5
Interfaces.Nodenode_4
Interfaces.Nodenode_6
Interfaces.Nodenode_3
Interfaces.Nodenode_2
Interfaces.Nodenode_1
Interfaces.Nodenode_22

Components

TypeNameDefaultDescription
Realdelta_G1_G2
Realdelta_G1_G3
Realdelta_G2_G3Mutual angles
G_2G2
G_1G1
Basic.Generators.Infinite_busG3

Contents

NameDescription
G_2protected
G_3protected
G_1protected