Same behaviour as TestTwoBusesTwoTransmLinesWithBreakersOneLoad, but this time the breaker at portB of the line1 is opened in the time interval 1 to 10 seconds.
When the breaker is open, the active power from line 2 is doubled, while the active power from the infiniteBus1 is reduced to the ones dissipated to the open line (i.e. Rseries+Rshunt).