Three state dynamic turbine model as state transition graph
L1: Models are based on characteristic lines and / or transfer functions
A hysteresis has been added for the state change from halt to startup. Sometimes chattering can occur at this switch which can be avoided using the hysteresis.
Parameter 'MinimumDownTime' defines minimum time that power plant has to be shut down before beeing able to start up again.
(no remarks)
P_set_star: input for electric power in W
P_set_star_lim: output for electric power in W
(no remarks)
(no remarks)
slewRateLimiter: set P_grad_operating =-1, if slewRateLimiter is not needed.
Tested in check model "TestThreeStateDynamic" and "TestThreeStateDynamic_Initatmin"
(no remarks)
Model created by Pascal Dubucq (dubucq@tuhh.de) on 01.10.2014
Quality check (Code conventions) by Rebekka Denninger on 01.10.2016
Hysteresis for halt-startup change added by Carsten Bode (c.bode@tuhh.de) in Nov 2018
Model modified by Oliver Schülting (oliver.schuelting@tuhh.de) in Nov 2018: added Minimum Down Time
Model modified by Oliver Schülting (oliver.schuelting@tuhh.de) on April 2019: added option to deactivate slewRateLimiter, added minimum operation time
Model modified by Robert Flesch (flesch@xrg-simulation.de) in Feb 2021: set output to zero if shutdown is active - check if shutdown is complete by using the power input