.TransiEnt.Grid.Electrical.LumpedPowerGrid.Check.TestTwoGridArchitecture

Information

1. Purpose of model

This validation model produces results that correspond to Page A1-7 of the entso-e operational handbook appendix 1: Load-frequency control.

2. Level of detail, physical effects considered, and physical insight

(no remarks)

3. Limits of validity

(no remarks)

4. Interfaces

(no remarks)

5. Nomenclature

(no remarks)

6. Governing Equations

(no remarks)

7. Remarks for Usage

(no remarks)

8. Validation

(no remarks)

9. References

(no remarks)

10. Version History

Contents

NameDescription
 ExpectedResult

Generated at 2025-01-21T19:25:52Z by OpenModelicaOpenModelica 1.24.3 using GenerateDoc.mos