.TransiEnt.Producer.Electrical.Base.ControlPower.PrimarySecondaryAndSchedule

Plant in both scheduled and Primary and Secondary Control operation

Information

1. Purpose of model

Plant in both scheduled Primary and Secondary Control operation.

2. Level of detail, physical effects considered, and physical insight

L1 (defined in the CodingConventions) - only active power and frequency.

3. Limits of validity

(no remarks)

4. Interfaces

(no remarks)

5. Nomenclature

(no remarks)

6. Governing Equations

(no remarks)

7. Remarks for Usage

(no remarks)

8. Validation

(no remarks)

9. References

(no remarks)

10. Version History

Model created by Pascal Dubucq (dubucq@tuhh.de) on 01.10.2014

Quality check (Code conventions) by Rebekka Denninger on 01.10.2016


Generated at 2025-04-03T18:24:42Z by OpenModelicaOpenModelica 1.24.5 using GenerateDoc.mos