Nordic test grid with buses, lines, shunts, loads, transformers and generators, used for load flow calculationThis model extends the network with alpha-beta loads model, it could also extend the network with PQ loads model.
Generated at 2025-12-06T19:14:00Z
by OpenModelicaOpenModelica 1.25.7 using GenerateDoc.mos