Record of Picasso collective housing settings according to the date of construction
Hypothesis and equations
none
Bibliography
none
Instructions for use
none
Known limits / Use precautions
Warning : thermal bridges have been set to null because of a lack of data, it will be necessary to complete them when more details are available.
Validations
Validated model - Benoît Charrier 12/2015
--------------------------------------------------------------
Licensed by EDF under a 3-clause BSD-license
Copyright © EDF 2009 - 2023
BuildSysPro version 3.6.0
Author : Benoît CHARRIER, EDF (2015)
--------------------------------------------------------------
record Picasso2012_STD = BuildSysPro.BuildingStock.Utilities.Records.BuildingData.CollectiveHousing.BuildingDataPICASSO.BuildingType(UvitrageAF = 1.5, redeclare parameter WallData.CollectiveHousing.RT2012_STD.Door Porte, redeclare parameter WallData.CollectiveHousing.IntDoor PorteInt, redeclare parameter WallData.CollectiveHousing.IntermediateFloor PlancherInterm, redeclare parameter WallData.CollectiveHousing.RT2012_STD.ExtWall MurExt, redeclare parameter WallData.CollectiveHousing.RT2012_STD.LandingWall MurPalier, redeclare parameter WallData.CollectiveHousing.RT2012_STD.Ceiling ParoiSousCombles, redeclare parameter WallData.CollectiveHousing.RT2012_STD.Floor PlancherBas, redeclare parameter WallData.CollectiveHousing.PartitionWall Cloisons, PontsTh_Generique = 0.00, PontsTh_Bas = 0.00, PontsTh_Haut = 0.00, TauxRenouvAir = 0.3, Hsext = 25, Hsint = 7.69, HsParoiSousCombles = 10);
Benoît Charrier 06/2017 :
renouvAir
from 0,426 to 0,3 vol/h to fit with a humidity sensitive ventilation system which is commonly used in RT2012UvitrageAF
and UvitrageSF
from 1,2 to 1,5 W/m2.K which is more representative of RT2012