.Buildings.Fluid.Movers.Validation.PowerEuler

Information

This example is identical to Buildings.Fluid.Movers.Validation.PowerSimplified, except that the efficiency of the flow controlled pumps pump_dp and pump_m_flow is estimated by using the Euler number and its correlation as implemented in Buildings.Fluid.Movers.BaseClasses.Euler.

The figure below shows the approximation error for the power calculation where the speed y differs from the nominal speed ynominal.

image

Revisions


Generated at 2024-11-26T19:26:15Z by OpenModelicaOpenModelica 1.24.2 using GenerateDoc.mos