.Buildings.Templates.Plants.Controls.Pumps.Primary.DisableDedicated

Pump disable for plants with dedicated primary pumps

Information

The pump is disabled when the associated plant equipment is disabled and:

When the flow request point is available, the default value for the pump disable delay dtOff is increased from 3 min to 10 min to ensure that flow is not cut off too soon.

Details

Used in Guideline 36 for disabling dedicated primary pumps in chiller and boiler plants.

The enable signal u1 is yielded by the staging event sequencing logic.