Simple test case that verifies whether the schedule for the internal loads used by EnergyPlus is modified from Modelica, and the electrical equipment load that is controlled by this schedule is reported correctly.
The instance assEqu asserts that the input and
output of EnergyPlus are correctly synchronized. If the output were
delayed, the simulation would stop with an error.