Nordic test grid with buses, lines, shunts, loads, transformers and generators, used for load flow calculationThis model extends the network with alpha-beta loads model, it could also extend the network with PQ loads model.
Generated at 2025-10-24T18:21:15Z
by OpenModelicaOpenModelica 1.25.5 using GenerateDoc.mos