Nordic test grid with buses, lines, shunts, loads, transformers and
generators, used for load flow calculation
This model extends the network with alpha-beta loads model, it
could also extend the network with PQ loads model.
Generated at 2026-06-20T20:18:53Z by OpenModelicaOpenModelica 1.26.9 using
GenerateDoc.mos