Nordic test grid with buses, lines, shunts, loads, transformers and generators, used for load flow calculationThis model extends the network with alpha-beta loads model, it could also extend the network with PQ loads model.
Generated at 2026-02-24T19:19:10Z
by OpenModelicaOpenModelica 1.26.2 using GenerateDoc.mos