.OpenIPSL.Examples.IEEE9.IEEE_9_Buses

Information

This example is composed by the base WSCC 9-bus 3-machine system. The system undergoes a three-phase-to-ground fault at 3s, lasting for 100ms. Simulate the system for 20 seconds.

Variables of interest are

Compare the results with the ones obtained when simulating IEEE_9_Buses_Statcom.


Generated at 2024-11-21T19:25:40Z by OpenModelicaOpenModelica 1.24.2 using GenerateDoc.mos