.OpenIPSL.Examples.IEEE9.IEEE_9_Buses

IEEE (WSCC) 9-bus 3-machine base test system

Information

This example is composed by the base WSCC 9-bus 3-machine system. The system undergoes a three-phase-to-ground fault at 3s, lasting for 100ms. Simulate the system for 20 seconds.

Variables of interest are

Compare the results with the ones obtained when simulating IEEE_9_Buses_Statcom.


Generated at 2025-04-26T18:20:16Z by OpenModelicaOpenModelica 1.25.0 using GenerateDoc.mos