This example is composed by the 33-bus 12-machine system representing a distribution-level subsystem of Norway.
The system undergoes a three-phase fault on Bus 26 at 1s, lasting for 20ms. Simulate the system for 10 seconds.
Variables of interest are the voltages in many buses. For example:
B3.v
B11.v
B26.v