modelNetwork

Base network for testing resynchronization of a generation unit

Extends from Modelica.Icons.Example (Icon for runnable examples).

Information

This example system shows how the preparation for resynchronization of Generator 2 to the grid. Note that at 2 seconds, a signal is triggered so voltages between buses 3 and 4 should be equal.

Simulate the system for 10 seconds. Variables of interest are:

  • B3.v
  • B4.v
  • G1.gen.SPEED
  • G2.gen.SPEED

Note the behavior of those variables before and after the connection of generator G2 to the main grid.

Components

TypeNameDefaultDescription
OpenIPSL.Electrical.Buses.BusBG1
OpenIPSL.Electrical.Buses.BusB1
OpenIPSL.Electrical.Branches.PSSE.TwoWindingTransformerT1
Generators.G1G1
OpenIPSL.Electrical.Branches.PwLineL1
OpenIPSL.Electrical.Buses.BusB2
OpenIPSL.Electrical.Buses.BusB3
OpenIPSL.Electrical.Branches.PwLineL2_1
OpenIPSL.Electrical.Branches.PwLineL2_2
OpenIPSL.Electrical.Machines.PSSE.GENCLSIB
OpenIPSL.Electrical.Buses.BusB4
OpenIPSL.Electrical.Branches.PwLineL3
OpenIPSL.Electrical.Buses.BusB5
OpenIPSL.Electrical.Branches.PSSE.TwoWindingTransformerT2
OpenIPSL.Electrical.Loads.PSSE.LoadLD2
Generators.G2G2
OpenIPSL.Electrical.SystemBaseSysData
OpenIPSL.Electrical.Loads.PSSE.LoadLD1
Breakers.Breakerbreaker1