.OpenIPSL.Examples.Tutorial.Example_3.Example_3

Fully assembled 9-bus 3-generator test system

Information

This example system represents a 9-bus 3-generator test system with a three-phase-to-ground fault at bus 9 and it must be simulated during 20 seconds.

Variables of interest are:

Note that the voltage curves present different acting modes. Also note that disturbances in the AVR reference voltage can be added to each generation unit.


Generated at 2025-04-03T18:24:42Z by OpenModelicaOpenModelica 1.24.5 using GenerateDoc.mos