.ScalableTestSuite.Power.ConceptualPowerSystem.Verification.OneGeneratorStepLoad

One generator with 5% step reduction from equilibrium

Information

Test case with a single generator. At time = 0, the load is reduced by 5%. Primary frequency control limits the frequency deviation to about 0.2 Hz, then the secondary frequency controller brings the frequency back to 50 Hz.