modelElectrolyzer_2035

Cost model for electrolyzers in 2035

Extends from PartialCostSpecs (Base model for cost specifications).

Information

1. Purpose of model

cosst model for electrolyzer in 2035

2. Level of detail, physical effects considered, and physical insight

(no remarks)

3. Limits of validity

(no remarks)

4. Interfaces

(no remarks)

5. Nomenclature

(no remarks)

6. Governing Equations

(no remarks)

7. Remarks for Usage

(no remarks)

8. Validation

(no remarks)

9. References

[1] K. Stolzenburg, "Integration von Wind-Wasserstoff-Systemen in das Energiesystem", 2014

10. Version History

Parameters

TypeNameDefaultDescription
Units.MonetaryUnitPerPowerCspec_inv_der_E (from PartialCostSpecs)0Specific invest cost per nominal power
TransiEnt.Basics.Units.MonetaryUnitPerEnergyCspec_inv_E (from PartialCostSpecs)0Specific invest cost per nominal energy capacity
Realsize1 (from PartialCostSpecs)0Size 1 of the component
Realsize2 (from PartialCostSpecs)0Size 2 of the component
Units.MonetaryUnitC_inv_size (from PartialCostSpecs)0Invest cost depending on the size
Realfactor_OM (from PartialCostSpecs)0Percentage of the invest cost that represents the annual O&M cost
TransiEnt.Basics.Units.MonetaryUnitPerEnergyCspec_OM_W_el (from PartialCostSpecs)0Specific O&M cost per electric energy
TransiEnt.Basics.Units.MonetaryUnitPerEnergyCspec_OM_Q (from PartialCostSpecs)0Specific O&M cost per heating energy
TransiEnt.Basics.Units.MonetaryUnitPerEnergyCspec_OM_H (from PartialCostSpecs)0Specific O&M cost per gas energy
TransiEnt.Basics.Units.MonetaryUnitPerEnergyCspec_OM_other (from PartialCostSpecs)0Specific O&M cost per other resource, e.g. water
Units.MonetaryUnitC_other_fix (from PartialCostSpecs)0Fix other cost
Units.Time_yearlifeTime (from PartialCostSpecs)0Life time

Components

TypeNameDefaultDescription
TransiEnt.SimCentersimCenter (from PartialCostSpecs)