.TransiEnt.Components.Statistics.ConfigurationData.GeneralCostSpecs.Electrolyzer_2050

Information

1. Purpose of model

cost model for electrolyzer in 2050

2. Level of detail, physical effects considered, and physical insight

(no remarks)

3. Limits of validity

(no remarks)

4. Interfaces

(no remarks)

5. Nomenclature

(no remarks)

6. Governing Equations

(no remarks)

7. Remarks for Usage

(no remarks)

8. Validation

(no remarks)

9. References

[1] K. Stolzenburg, "Integration von Wind-Wasserstoff-Systemen in das Energiesystem", 2014

10. Version History


Generated at 2024-11-24T19:25:44Z by OpenModelicaOpenModelica 1.24.2 using GenerateDoc.mos