.Buildings.Templates.ZoneEquipment.Components.Interfaces.ControllerG36VAVBox

Guideline 36 controller for VAV terminal unit

Information

Description

This is an implementation of the control sequence specified in ASHRAE (2021) for VAV terminal units with reheat. It contains the following components.

References


Generated at 2025-03-04T19:24:58Z by OpenModelicaOpenModelica 1.24.4 using GenerateDoc.mos