.ScalableTestSuite.Power.ConceptualPowerSystem.Verification.TenGeneratorsStepLoad

Information

Test case with ten generators connected in a linear fashion by transmission lines with the same impedance. At time = 0 the load attached to the first generator is reduced by 50%. Fast electro-mechanical oscillations are triggered, along with slower thermal transients, until eventually the whole system re-settles at equilibrium in about 200 s.