.ScalableTestSuite.Power.ConceptualPowerSystem.Verification.TwoGeneratorsStepLoad

Information

Test case with a two generator connected by a transmission line. At time = 0 the load attached to the first generator is reduced by 50%. Fast electro-mechanical oscillations are triggered, along with slower thermal transients, until eventually the whole system re-settles at equilibrium in about 200 s.


Generated at 2024-05-16T18:15:58Z by OpenModelicaOpenModelica 1.22.4 using GenerateDoc.mos